376-277A LNER Thompson Brake Second Corridor BR Maroon No. E16859E Card-Kit in May 1902
Description
in May 1902
Cattle wagons were the first of the specialised wagons to be produced and reference to their manufacture and use has been established as far back as 1848
Front / rear trainline and MU hoses with silver ends
Thunderbird 2 Launch Bay
The kits are based on real world prototypes but are easily customizable lending themselves to “kit bashing” should the modeler wish to have something truly bespoke on their layout
376-277A LNER Thompson Brake Second Corridor BR Maroon No. E16859E Card-Kit in May 1902Entering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























