US$ 19.90
RUNNING NUMBER 39612
waiting room or greenhouse: it has many possibilities
Only 712 people survived the disaster
- Build time: 2 to 4 hours
UNCONTROLLED OUTPUT 2 12v DC
374-561A GWR Hawksworth Composite Corridor GWR Chocolate & Cream No.7254 1-87-Scale RUNNING NUMBER 39612Frederick W. Hawksworth was the last Chief Mechanical Engineer of the Great Western Railway (GWR), succeeding Charles Collett in 1941, and his coach designs were the final evolution of passenger stock built by the GWR, being designed at the end of World War Two and entering traffic from 1947 onwards. With the Nationalisation of Britains railways in 1948, construction continued under BR and the final examples were outshopped during the 1950s. Intended
US$ 19.90
US$ 69.90
US$ 150.00
US$ 52.59
US$ 139.00
US$ 29.90
US$ 57.96
US$ 165.00
US$ 52.59
US$ 59.90
US$ 69.90